Minister of Petroleum and Natural Gas
This link shall take you to a webpage outside mopng.gov.in. For any query regarding the contents of the linked page, please contact the webmaster of the concerned website.
JOINT STATEMENT BETWEEN THE MINISTRY OF PETROLEUM AND NATURAL GAS OF INDIA AND MINISTRY OF ENERGY AND NATURAL RESOURCES OF CANADA
JOINT STATEMENT BETWEEN THE MINISTRY OF PETROLEUM AND NATURAL GAS OF THE REPUBLIC OF INDIA AND THE MINISTRY OF ECONOMY, TRADE AND INDUSTRY OF JAPAN ON ENERGY RESILIENCE
Open Acreage Licensing Policy - Home
DSF Bid Round IV
Special CBM Bid Round-2025
Special CBM Bid Round-2026
Welcome to DGH e-Procurement
If complainants fail to get internal redress,DPG(https://dpg.gov.in/)can be approached for redress of grievance
Guidelines for domestic gas supply to Compressed Natural Gas (Transport) & piped Natural Gas (Domestic) segments of Cify Gas Distribution networks. (Pdf, 630KB)
Final Report-Energy Transition Advisory Committee(2023)
Committee Report on Synthetic Fuels
Revised - LPG maintenance order
LPG maintenance order| S.No | Title | Download/Details |
|---|---|---|
| 1 | Details of Tours of officials as on 20th Dec 2013 |
Download (746.08 KB) |
| 2 | Details of foreign visits of Dr. Archana S. Mathur, Ex-Economic Adviser (PNG) |
Download (35.07 KB) |
| 3 | Model PSCs |
Pre NELP Exploration Download (5.39 MB) |
| 4 | Model PSCs |
Pre NELP Discovered Field Download (8.44 MB) |
| 5 | Model PSCs |
Discovered Small Field Download (12.00 MB) |
| 6 | Model PSCs |
NELP-I Download (3.98 MB) |
| 7 | Model PSCs |
NELP-II Download (3.89 MB) |
| 8 | Model PSCs |
NELP-III Download (4.01 MB) |
| 9 | Model PSCs |
NELP-IV Download (3.89 MB) |
| 10 | Model PSCs |
NELP-V Download (2.98 MB) |
| 11 | Model PSCs |
NELP-VI Download (4.99 MB) |
| 12 | Model PSCs |
NELP-VII Download (4.10 MB) |
| 13 | Model PSCs |
NELP-VIII Download (4.26 MB) |
| 14 | Model PSCs |
NELP-IX Download (2.76 MB) |
| 15 | Status of Exploration |
Actual Blockwise Work done Download (16.52 KB) |
| 16 | Status of Exploration |
MWP NELP 5-NELP 9 Download (17.03 KB) |
| 17 | Status of Exploration |
Blockwise Exploration Status Download (17.84 KB) |
| 18 | Allotment of blocks |
EXPLORATION BLOCKS AWARDED UNDER PRE-NELP-1 Download (54.70 KB) |
| 19 | Allotment of blocks |
EXPLORATION BLOCKS AWARDED UNDER PRE-NELP-2 Download (54.70 KB) |
| 20 | Status of Discoveries |
Status of Discoveries Download (23.92 KB) |
| 21 | Status of Production |
Status of Production Download (512.04 KB) |
| 22 | AWP |
AWP Download (21.92 KB) |
| 23 | Details of Board of Directors of various PSUs under MoPNG |
Details of Board of Directors of various PSUs under MoPNG Download (177.43 KB) |
| 24 | Creation of 100 JS level posts in IIPE, Visakhapatnam |
Download (587.03 KB) |
| 25 | Policies |
Definition of Petroleum Download (711.34 KB) |
| 26 | Policies |
New Domestic Natural Gas Pricing Guidelines 2014 Download (1.39 MB) |
| 27 | Policies |
Marketing including Price Freedom for the gas Download (1,014.19 KB) |
| 28 | Policies |
Policy for the grant of extension to PSC-Pre NELP Download (3.94 MB) |
| 29 | Policies |
Policy Framework for relaxations Download (3.09 MB) |
| 30 | Policies |
Policy Framework for streamlining the operations Download (1.27 MB) |
| 31 | Policies |
Policy for the grants of extension to PSC-Fields to PJV Download (2.34 MB) |
| 32 | Policies |
Policy for testing requirements Download (1,004.51 KB) |
| 33 | Appointment of President of Board of Governors in IIPE |
Appointment of President of Board of Governors in IIPE Download (401.05 KB) |
| 34 | Appointment of Directors in RGIPT |
Appointment of Directors in RGIPT Download (447.58 KB) |
| 35 | List of Foreign tours undertaken by the officials in the year 2019-2020 |
Download (186.00 KB) |
| 36 | List of Domestic tours undertaken by the officials in the year 2019-2020 |
Download (224.20 KB) |